Water Tank Contaminated Soil Remediation, Barrow, Alaska Client: Barrow Utilities and Electric Coope

Hydrocarbon contamination of soil was discovered during geotechnical investigations on a 1,000,000 gallon water tank, in Barrow,...

Featured Project

North Slope Borough Area Wide Fuel Tank...

Provided construction administration support for the first phase of area wide tank farm upgrades, including repairs for grading, fencing and miscellaneous tank...

Full Project

North Slope borough Assembly Room...

The North Slope Borough Assembly meeting room in Barrow, Alaska, was in need of increased space, better sightlines, and information technology upgrades. Through a...

Full Project

Barrow Arctic Research Center Road

Seasonal storms often damage the shoreline road (Stevenson Street) and prevent emergency access to the NARL facility north of Barrow, Alaska. UMIAQ is providing...

Full Project

Barrow Water and Sewer Extension

For this North Slope Borough project, UMIAQ developed a Project Analysis Report to extend water and sewer mains and add new services to 42 buildings along Ahgeak...

Full Project

Barrow Global Climate Change Research...

This 60,000 s.f. arctic research lab on the coast of the Arctic Ocean presented both physical and programmatic challenges. The remote arctic environment required...

Full Project